No products in the cart.

Construction Jobsite Management 4e William R Mincks Hal Johnston - Test Bank

Construction Jobsite Management 4e William R Mincks Hal Johnston - Test Bank   Instant Download - Complete Test Bank With Answers     Sample Questions Are Posted Below     1.       When preparing for the project, the contractor begins the documentation process by keeping logs and schedules for product submittals.   a. True   b. …

$19.99

Construction Jobsite Management 4e William R Mincks Hal Johnston – Test Bank

 

Instant Download – Complete Test Bank With Answers

 

 

Sample Questions Are Posted Below

 

 

1.       When preparing for the project, the contractor begins the documentation process by keeping logs and schedules for product submittals.

  a. True
  b. False

 

 

 

2.       ​Compliance with most contractors’ safety programs requires that all visitors to the jobsite be entered in the daily report.

  a. True
  b. False

 

 

 

3.       A diary is really the employee’s property.

  a. True
  b. False

 

 

 

4.       Progress meetings are the most common during the design phase of the project.

  a. True
  b. False

 

 

 

5.       During the first half of the project, a primary concern is processing submittals, samples, and shop drawings.

  a. True
  b. False

 

 

 

6.       The current status of change orders should be discussed in

  a. the daily report b. the progress meeting
  c. the personal diary d. the document control log

 

 

 

7.       A ____ log records revisions, with dates and reference-associated documents, such as change orders.

  a. document control b. subcontractor
  c. time-lapse d. progress

 

 

 

8.       Prior to beginning project construction, the contractor normally prepares a ____ that lists the types of material, the amount, the vendor, and the cost.

  a. purchase order b. bill of material
  c. letter of transmittal d. request for clarification

 

 

 

9.       The ____ is a dated record of when a particular document or item was sent to another party.

  a. requests for information b. personal diary
  c. punch list d. letter of transmittal

 

 

 

 

 

 

10.   In progress meeting minutes, the ____ should address the type of document, type of meeting, date of the meeting, and sequential number of the meeting.

  a. project designation b. title
  c. previous meeting minutes d. roster

 

 

 

11.   A request for information, or RFI, is typically sent from contractor to the____________.

 

 

12.   The weekly or monthly report for internal management is normally written in ____________________ form.

 

 

13.   The ____________________ can be an accurate account of telephone conversations, or it can be a list that contains the time of the call, the person called, and the person calling.

 

 

14.   Any activity that involves motion within a relatively short duration is a good subject for a(n) ____________________.

 

 

15.   A company’s safety program typically requires specific ____________ reports.

 

 

 

16.   Explain the importance of complete and accurate documentation and how it is achieved.

 

 

 

 

 

 

17.   Discuss why weather information is important for project documentation.

 

 

 

 

 

 

18.   Explain the purpose of a subcontractor log.

 

 

 

 

 

 

19.   What does time-lapse photography involve and when is it used?

 

 

 

 

 

20.   Explain the methods used to record parties in attendance at a meeting.

 

 

 

Additional information

Add Review

Your email address will not be published. Required fields are marked *