Construction Project Administration 10th Edition By Fisk - Test Bank   Instant Download - Complete Test Bank With Answers     Sample Questions Are Posted Below   CHAPTER 3   ANSWERS   Beginning date; completion date; and job logic Establish inspection policy; specify acceptance and rejection procedures; identify tests and inspections required; determine types and …

$19.99

Construction Project Administration 10th Edition By Fisk – Test Bank

 

Instant Download – Complete Test Bank With Answers

 

 

Sample Questions Are Posted Below

 

CHAPTER 3

 

ANSWERS

 

  1. Beginning date; completion date; and job logic
  2. Establish inspection policy; specify acceptance and rejection procedures; identify tests and inspections required; determine types and frequency of tests required; specify sampling and testing methods; and determine who will perform sampling and testing on or off site.
  3. Copy machine; telephone; FAX machine on dedicated telephone line; and, on larger jobs, a PC computer and printer
  4. a. = 4; b. = 5;   c. = 2:   d. = 3;   and e. =  1

(A subcontractor must first submit to the General Contractor, who then submits to the Resident Project Representative.  The Resident Project Representative, after logging in the submittal, should send it directly to the Project Manager, who may further refer the matter to his or her staff designers for review and recommendation. The return process involves having the Project Manager return ALL of the submittal copies to the Resident Project Representative for logging out and making the distribution.)

  1. 10 total (One Resident Engineer; 3 field clerks; and 6 inspectors)
  2. 39 m2 floor area (3.0 m by 12.8 m body) or (420 sq ft floor area; 10 ft by 42 ft)
  3. Record Drawings (NOT “as-built” drawings;  see 48 CFR 36.102 for federal definition)
  4. RFI is an acronym for a “Request for Information.” It is widely used in construction to document questions and answers about various elements of a project that require further explanation or clarification.
  5. Sustainable sites; water efficiency; energy and atmosphere; materials and resources; and environmental quality.
  6. Certified (40); silver (50); gold (60); and platinum (80).